This is the start of the rebuild which is the deconstruction of what remains of the damaged dock.
Eric takes most of the week off to go down and pull the old dock apart in preparation for the rebuild. Old lumber is stacked up by size and re-use potential. Some lumber will be firewood, some with find a reuse in the dock or ramp.